Brady reinstalled the flaperon and stick push rods after they were primed. We tried to connect the flaperon torque arms but the bolt would not go through the slightly offset holes with the rod end bearing in place. We removed the torque arms and drilled through with a rod end in place, then reinstalled. We are preparing the A/P servos for installation. Nash assisted Brady. Addison finished riveting the canopy forward bar.